Download Print this page

Screen Innovations Nano Box Installation Instructions Manual page 3

24v dc - sdn

Advertisement

INSTALLATION - 24V DC - SDN
1. Terminate pre-wire with the supplied terminal block.
+ 24 VDC
V+
- 24 VDC
V-
Data +
+
Data -
-
Data ground
G
2. Install wall brackets 4 - 6 inches from the jamb using the supplied screws.
(The closer to the end of the cassette, the better)
4" - 6"
Installation - 24V DC SDN
Header
Data For SDN Only
4" - 6"
Pg 3
INSTALLATION - 24V DC - SDN
3. Make sure the wall bracket lever is down (may already be down).
4. Install terminal block bracket between jamb and wall bracket on the motor side using the
supplied screws
4" - 6"
Terminal block bracket must be on motor side.
Installation - 24V DC SDN
Proper position for installing Box
Header
4" - 6"
Pg 4

Advertisement

loading