gAvilar gACC-499E/U Manual page 23

Communication unit for encoder/gavc 1200
Table of Contents

Advertisement

gACC-499E/U Communication unit
gACC-499E_U_Manual_EN.doc
After performing "Setting time correction" the below screen will be displayed.
Battery Status
The battery status can be read by performing "Get Battery Status:.
In this window the start date of battery 1 (Group 1) and the start date of battery 2 (Group 2) will be displayed.
At Alarm start the date at which the status is changed into "Replacement after X months" will be displayed.
Where X is defined in the config file. (usually this is 6 months)
In case of a new device a date in the far future will be displayed for battery 2, to indicate that this battery is
not yet in operation. Alarm stop indicates when a new battery for battery 1 is placed.
GA-02.035-EN-30.05.17
Page 23 of 46

Advertisement

Table of Contents
loading

Related Products for gAvilar gACC-499E/U

Table of Contents