Power-Up Sequence - OPGAL EyeCGas 2.0 User Manual

Ogi – optical gas imager, camera
Hide thumbs Also See for EyeCGas 2.0:
Table of Contents

Advertisement

25.
Operation | Camera Startup

POWER-UP SEQUENCE

The camera goes through the following power-up sequence:
1. A black screen, followed by the Opgal logo, are displayed for
approximately ten seconds.
2. The cooler starts.
3. The camera starts in
visible
4. The cooler icon (A) blinks for 8-10 minutes, indicating the camera is
in cool down state.
5. The camera performs an automatic NUC when cool down is
complete (see
Performing Non-Uniformity Correction
6. Once cool down is complete, all viewing modes become available
and cooler icon (A) disappears.
▪ The cool down process allows the infrared detector to reach operating
cryogenic temperature. Once this temperature is achieved, the cooler
icon disappears, indicating cool down is complete.
▪ During the cool down process the camera menu is available (see
Settings).
MENU
SAFETY
OVERVIEW
mode.
(NUC)).
NOTES
Camera
OPERATION
TECHNICAL
SPECIFICATIONS
Replace this image
MAINTENANCE
TROUBLESHOOTING
www.
TECHNICAL
SUPPORT
EyeCGas® 2.0 | User Manual Rev 01 | Doc P/N: UM-8G9A0000B
A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents