Trane RTHC Installation Operation & Maintenance page 33

175-450 ton units (60 hz); 125-450 ton units (50 hz)
Table of Contents

Advertisement

Figure 11
Condenser and Evaporator Water Connections -
OUT
Cond
28-3/8"
IN
(721mm)
14-3/8" (365mm)
14-5/8" (371mm)
32" (813mm) for 150 psi
32-1/8" (816mm) for 300 psi
9-1/2" (241mm) for150 psi
9-3/8" (238mm) for 300 psi 11" (279mm) for 150psi
Installation, Operation and Maintenance
C2G1G1, D2G3G3, D1G2G2, D3G3G3, and E3G3G3
80" (2032mm)
OUT
Evap
IN
1-1/4" (32mm)
18-5/8" (473mm)
70" (1778mm)
68-5/8" (1743mm) [CGG]
OUT
IN
12" (305mm) for 300 psi
10-3/4" (273mm)
IN
12-1/2" (318mm)
3 Pass
Connection Configuration (Left or Right Hand)
Depends on Water Inlet
129-3/4" (3296mm)
9-1/4" (235mm) for 150 psi
10" (254mm) for 300 psi
Compressor
Evaporator
126" (3200mm)
Std. 4 Pass
7-1/4" (184mm) for 150 psi
7-5/8" (194mm) for 300 psi
13-1/4" (337mm)
9-1/4" (235mm) [CGG]
9-3/8" (238mm) for 150 psi, 4 Pass
10-5/8" (271mm) for 300 psi, 4 Pass
or 6 Pass
OUT
30-3/4" (781mm)
12-1/2" (318mm)
3 Pass
2 - 11