Trane RTHC Installation Operation & Maintenance page 128

175-450 ton units (60 hz); 125-450 ton units (50 hz)
Table of Contents

Advertisement

MENU ITEMS
Differential to start set-
point
Differential to stop set-
point
Evap pump off delay
Clear RI timer
SERVICE SETTINGS GROUP
FIELD START-UP GROUP (++--++)
Keypad/display Lock
Menu settings password
feature
ICS Address
Power up start delay
time
Design Delta Temp
Setpt
Lvg Wtr Temp Cutout
Setpt
Low Rfgt Cutout Setpt
Condenser Limit Setpt
Max. RI timer
Under/Over Voltage
Phase Reversal Protec-
tion
Phase Unbalance Limit
Momentary Power Loss
Protection
Soft Load Control
Soft Loading Starting
Current Limit
Soft Load Current Limit
Rate
Soft Load Leaving Water
Rate
LWT Control Propor-
tional Gain
LWT Control Integral
Reset TIme
LWT Control Rate TIme
EXV Max Travel Setpt
1-27.136-(Back)-(698)
SETTING
MENU ITEMS
Liq. Level Control Pro-
portional Gain
Liq. Level Control Inte-
gral Reset Time
Liq. Level Control Rate
TIme
Local Atmospheric Pres-
sure
SERVICE SETTINGS GROUP
D
E
MACHINE CONFIGURATION
GROUP (+-+-+-)
D
E
Compressor Frame Size
and Capacity
Nominal Unit Tons
Starter Type
Level 2 Contactor Integ-
rity Test
Rated Load Amps
Motor Heating Constant
Current Overload Setting
#1
Current Overload Setting
#2
D
E
Max Acceleration Timer
D
E
#1
Max Acceleration Timer
D
E
#2
D
E
Acceleration Time Out
Action
D
E
EXV Size
External Chilled Water
Setpt Option
Ext. Current Limit Option
High Pressure Cutout
Setting
Line Voltage Sensing
Option
Unit Line Voltage
Ice Building Option
SETTING
MENU ITEMS
Ext. Setpoint Inputs
Tracer Option
TCI Option
Print Option
Relay #1
Relay #2
Relay #3
Rfgt Pres. Output Option
Min Delta Pres. Calib.
Max. Delta Pres. Calib.
D
E
Shutdown
Transition
Install
Not Install
Install
Not Install
Install
Not Install
SETTING
4-20 ma
2-10 vdc
Install
Not Install
Install
Not Install
Install
Not Install

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

R series

Table of Contents