6.5

BEGINNING OF THE SPRAYING PROCESS

• Using the pressure regulator (Fig. 8, 3) on the control unit,
set the required working pressure (green area).
• Pull the trigger guard on the spray gun to start the pump.
If no material is coming out of the gun be-
cause the container is empty, the PC HP 30
reduces the pump speed (dry running rec-
ognition). Top up the material to continue
working. If there is an interruption of more
than 20 seconds, it may take a few mo-
ments until the material starts to come out
evenly again (spray test recommended).
If no material is added within around 2
minutes, the pump switches itself off and
must be restarted once the material is
topped up.
6.6

INTERRUPTIONS OF WORK / BREAKS

• Release the trigger guard.
• Move the selector switch (Fig. 8, 2) to „R" to release the pres-
sure (pressure gauge shows 0 bar).
• Set selector switch (fig. 8, 2) to "0".
Ensure that the pump area is filled with
material or conservation agent so that the
stator does not jam on the rotor. Always also
observe the pot time / curing time of the
material.
6.7

END OF THE SPRAYING PROCESS / END OF WORK

• Release the trigger guard.
• Move the selector switch (Fig. 8, 2) to „R" to release the pres-
sure (pressure gauge shows 0 bar).
• Set selector switch (fig. 8, 2) to "0".
Always lock the trigger guard at the end of
the spraying process.
Always clean the PC HP 30 after each use
(according to the instructions in Section 8) to