Central Heating System (Nz62Ch); Blower Circulation (Nz64) - Napoleon HIGH COUNTRY 3000H Installation And Operation Manual

Eco solid fuel burning zero clearance appliance
Table of Contents

Advertisement

Available languages

Available languages

2.4.2 central heating system (NZ62CH)

May be used to heat rooms up to 50 feet (15.2m) from the appliance. A wall mounted thermostat located in the
room to be heated controls the blower supplying warm air from the room containing the appliance. Consult with
a heating specialist to ensure a proper duct layout for your home. If the NZ62CH is installed at the bottom of the
appliance, it could introduce a cool draft into the room that the appliance is installed in. When attached to the top
sides of the appliance, it provides a higher heat output. This option may not be used in mobile homes.
EXAMPLE OF DEDICATED DUCTING SYSTEM
NO
DUCTING
CENTRAL HEATING
*
When installed with a masonry chimney, the hot air gravity and central heating system can only be installed off the sides.

2.4.3 blower circulation (NZ64)

The NZ64 provides an ideal means of circulating warm air within the room it
resides.
The blower will only operate when the doors are fully closed.
We recommend installing the blower in a different room or even a different
level of the house. This will generate greater air movement and improve the
distribution of the warm air cooling from the appliance as well as improving air
movement in the summer months if using the summer bypass switch option.
These options may be incorporated with one another. If the optional blower is
to be installed, make provision during framing to route a 110 volt power line to
the appliance. Detailed installation instructions are included with each venting
kit.
CENTRAL HEATING &
GRAVITY VENT OPTION
CENTRAL HEATING
*
SIDES
ONLY
general information
ATTIC
BLOWER
LOCATION
OPTIONS
NZ3000 H
BLOWER
W415-1761 / B / 12.21.18
EN
9

Advertisement

Table of Contents
loading

Table of Contents