How To Assign An S7 Program To An Os - Siemens SIMATIC PCS 7 Function Manual

Fault-tolerant process control systems (v8.0)
Hide thumbs Also See for SIMATIC PCS 7:
Table of Contents

Advertisement

Advantages of fault-tolerant components
4.5 Operator stations
Procedure
1. Open the Windows Explorer on the OS server.
2. Select the folder "Simatic Shell" in the tree view
3. Select the shortcut menu command Redundancy Settings....
4. Select the connection path through which the OS server pair is connected in the drop-down
5. Click "OK".
4.5.9

How to assign an S7 program to an OS

Introduction
The AS-OS assignment of a hierarchy folder in the plant view of SIMATIC Manager results in
the following in the component view:
● All CFC and SFC charts inserted in the plant view are stored in the chart folder of the
● All pictures and reports inserted in the plant view are stored in the folder of the assigned
Requirements
● The PCS 7 project is open in SIMATIC Manager.
● The plant view is activated.
142
– Windows Server 2003/2003 R2:
My Computer > Simatic Shell
– Windows 7/Windows Server 2008 R2:
Desktop > Computer > Simatic Shell
The "Redundancy Settings" dialog box opens.
list.
– For connection via RJ45 cable:
In the "Network adapter" dropdown list, select the network adapter to which you want
to attach the network cable for the redundant connection between the two PC stations
of a server pair.
– For a serial connection:
In the "Serial port" dropdown list, select the port to which you want to attach the null-
modem cable for the redundant connection between the two PC stations of a server
pair: "COM1" or "COM2"
Note
Oneconnection path is permitted between the two PC stations in a redundantly
configured server.
assigned AS.
OS.
Fault-tolerant Process Control Systems (V8.0)
Function Manual, 03/2012, A5E02779471-02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents