Advantages of fault-tolerant components
4.6 SIMATIC BATCH Stations
Step
4
5
4.6.2

How to configure a BATCH server and its redundant BATCH partner server

Introduction
The following describes how to configure a redundant BATCH server.
In the following example, the BATCH server is connected to the fault-tolerant terminal bus.
Requirements
● The SIMATIC BATCH software package (BATCH Engineering) has been installed in
● The PCS 7 project is open in SIMATIC Manager.
Procedure
1. In the component view of SIMATIC Manager, select the project into which you want to insert
2. Select the menu command Insert > Station > SIMATIC PC Station.
3. Select the SIMATIC PC station, select the menu command Edit > Object Properties and
4. Enter the Windows name of the computer to be used as the BATCH server in the "Computer
5. In the component view, select the SIMATIC PC station and double-click the "Configuration"
6. If the hardware catalog is not visible, select the menu command View > Catalog.
7. In the hardware catalog under "SIMATIC PC Station > BATCH...", select the "BATCH
8. Select the menu command File > Save, exit HW Config and change to SIMATIC Manager.
9. In the component view of SIMATIC Manager, select the project into which you want to insert
10.Select the menu command Insert > Station > SIMATIC PC Station.
11.Select the SIMATIC PC station, select the menu command Edit > Object Properties and
150
What?
Setting redundancy of the BATCH servers (Page 154)
Downloading the target systems for SIMATIC BATCH (Page 156)
addition to the PCS 7 software.
the BATCH server.
A new SIMATIC PC station is inserted in the selected project.
enter the desired name (in the example, BATCH server).
name" box.
object in the detailed view.
The hardware configuration of the SIMATIC PC station opens.
The hardware catalog opens.
application" and insert it in the configuration table by means of drag-and-drop.
the redundant BATCH server.
A new SIMATIC PC station is inserted in the selected project.
enter the desired name (in the example, BATCH partner server).
Fault-tolerant Process Control Systems (V8.0)
Function Manual, 03/2012, A5E02779471-02