Mira Platinum Installation Manual page 23

Hide thumbs Also See for Platinum:
Table of Contents

Advertisement

Fit Slide Bar Assembly over Wall
Brackets and secure with screws
supplied. (Do not overtighten.)
Connect ceiling extension tube.
Feed plastic pipe up through the
slide bar and extension into ceiling.
Do not allow any debris to block the
plastic pipe.
Push and twist plastic pipe end until
it "clicks" and locks in place.
Connect plastic pipe in ceiling to
outlet pipe from valve using elbow
supplied. Push all parts together
fully and lock elbow onto pipes
using clips supplied.
Connect elbow to Digital Mixer
Valve. Fit an isolating valve between
to enable easy maintenance. (Pipe
and isolating valve not supplied).
Lock pipe to elbow using clip
supplied.
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents