Best Practices for AC Power Connections

Procedure A: Working with the customer's electrician onsite

Site Planning Guide VMAX 250F, VMAX 450F, VMAX 850F, VMAX 950F with HYPERMAX OS
114
Use this procedure if the customer's electrician is available at the installation site.
This procedure requires three basic tasks that alternate between the customer's
electrician, the EMC CE and back to the customer's electrician.
Task 1: Customer's electrician
l
Task 2: EMC Customer Engineer (CE)
l
Task 3: Customer's electrician
l