EMC racking for VMAX 250F

Two system configurations

EMC rack requirements for customer components

Site Planning Guide VMAX 250F, VMAX 450F, VMAX 850F, VMAX 950F with HYPERMAX OS
88
Two VMAX 250F systems can be installed in a rack. Each system can have one or two
V-Bricks. The second system must be installed as a field upgrade option.
VMAX 250F systems in a rack must conform to the following requirements:
Lower system: 1U - 20U
l
Upper system 21U - 40U
l
The following diagrams illustrate possible configurations for two VMAX 250F systems
in a rack.
Customer components can coexist in an EMC rack with a VMAX 250F system. The
system must be properly positioned within the rack in accordance with following
physical placement rules:
EMC equipment should stack from the bottom while customer equipment stacks
l
from the top of the rack.
A system must exist within contiguous space.
l
(Customer equipment must be above a VMAX 250F system and not interwoven
within the EMC system.)
All customer equipment must be electrically isolated and powered by a second pair
l
of PDP/PDUs. This pair is sold as an optional kit.
EMC racks with two VMAX 250F systems cannot install customer components in
l
the rack.