Passat 2011 ➤ , Passat Variant 2011 ➤
Body Repairs - Edition 04.2011
– Transfer parting cut to sealing channel -1- and to D-pillar re‐
inforcing -2- and cut to size.
– Separate original joint from D-pillar reinforcement part section.
8.3.2
Welding in
Note
New part must be welded in within 90 minutes or adhesion of ad‐
hesive will be impaired.
– Adapt new part with vehicle positioned on alignment bracket
set and fix in place.
– Check fit with bolt-on parts.
314
Rep. gr.53 - Body - rear