Mounting Modules Onto The Rail - Siemens Simatic S7-300 CPU 31xC Series Installation And Operating Instructions Manual

Hide thumbs Also See for Simatic S7-300 CPU 31xC Series:
Table of Contents

Advertisement

5.3

Mounting modules onto the rail

Requirements for module installation
• The configuration of the automation system is completed.
• The mounting rail is installed.
Mounting order of the modules
Hang the modules onto the rail, starting at the left and in the following order:
1. Power supply module
2. CPU
3. SMs, FMs, CPs, IMs
S7-300, CPU 31xC and CPU 31x: Installation
Operating Instructions, Edition 08/2004, A5E00105492-05
Note
Please check before you insert any SM 331 analog input modules whether you have to
reposition the measuring range submodules at the side of the module. For further
information, refer to chapter 4, "Analog Modules" in your
Note
When installing an S7-300 system with ungrounded reference potential, make the
relevant settings on the CPU. You ideally do so before you mount any modules onto the
rail.
5.3 Mounting modules onto the rail
Module Data
Reference Manual.
Installing
5-7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic s7-300 cpu 312cSimatic s7-300 cpu 313c-2 dpSimatic s7-300 cpu 314c-2 ptpSimatic s7-300 cpu 314c-2 dpSimatic s7-300 cpu 312Simatic s7-300 cpu 31 series ... Show all

Table of Contents