Examples Of An Emc-Compliant Installation: Wall Mounting - Siemens Simatic S7-300 CPU 31xC Series Installation And Operating Instructions Manual

Hide thumbs Also See for Simatic S7-300 CPU 31xC Series:
Table of Contents

Advertisement

Appendix
A.2 Protection against electromagnetic interference
Key to installation
The numbers in the following list refer to the numbers in the figure above.
Table A-6
No. Meaning
1
2
3
4
5
6
7
8
A.2.5

Examples of an EMC-compliant installation: Wall mounting

Wall mounting
When operating your S7 in a low-noise environment that conform with permitted ambient
conditions (see Appendix Ambient conditions), you can also mount your S7 in frames or to
the wall.
Interference coupling must be diverted to large metal surfaces. Therefore, always mount
standard profile/shielding/protective conductor rails on metal parts of the construction. Steel
sheet panels reference potential surfaces have been found especially suitable for wall-
mounting.
Provide a shielding conductor bar for connecting your cable shielding. This shielding
conductor bar can also be used as protective ground bar.
A-10
Key to example 1
Explanation
Ground straps
If no large-surface metal-to-metal connections are available, you must
either interconnect inactive metal parts (e.g. cabinet doors or mounting
plates) or bond them to chassis ground using ground straps. Use short
ground straps with a large surface.
Supporting bars
Interconnect the supporting bars on a large area to the cabinet walls
(metal-to-metal connection).
Mounting the rail
The mounting bar and rack must be interconnected with large-area
metal-to-metal connections.
Signal cables
Connect the shielding of signal cables on a large area of the protective
conductor/additional shielding conductor bar and fasten them with cable
clamps.
Cable clamp
The cable clamp must cover a large area of the shielding braid and
ensure good contact.
Shielding conductor
Interconnect the shielding conductor bar on a large surface with the
bar
supporting bars (metal-to-metal connection). The cable shielding is
terminated on the conductor bar.
Protective conductor
Interconnect the protective conductor bar on a large surface with the
bar
supporting bars (metal-to-metal connection). Interconnect the
grounding busbar with the protective ground system, using a separate
cable (minimum cross-section 10
Cable to the
Interconnect the cable on a large area with the protective ground
protective ground
system (equipotential ground).
system (equipotential
ground)
).
2
S7-300, CPU 31xC and CPU 31x: Installation
Operating Instructions, Edition 08/2004, A5E00105492-05

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic s7-300 cpu 312cSimatic s7-300 cpu 313c-2 dpSimatic s7-300 cpu 314c-2 ptpSimatic s7-300 cpu 314c-2 dpSimatic s7-300 cpu 312Simatic s7-300 cpu 31 series ... Show all

Table of Contents