Siemens Simatic S7-300 CPU 31xC Series Installation And Operating Instructions Manual page 150

Hide thumbs Also See for Simatic S7-300 CPU 31xC Series:
Table of Contents

Advertisement

Commissioning
8.5 Commissioning PROFIBUS DP
Tip:
When commissioning the CPU as DP master, always program OB82 and OB86. This helps
you to recognize and evaluate data exchange errors or interruption.
Programming, status/control via PROFIBUS
As an alternative to the MPI interface, you can program the CPU or execute the PG's status
and control functions via the PROFIBUS­DP interface.
Note
The use of Status and Control function via the PROFIBUS-DP interface extends the DP
cycle.
Constant Bus Cycle Time
In STEP 7 V 5.x or higher you can configure constant bus cycle times for PROFIBUS
subnets. Details on constant bus cycle times are found in the
Start-up of the DP master system
CPU 31x-2 DP / 31xC-2 DP is a DP master
Customize the startup monitoring time for DP slaves at the parameter Monitoring time for parameter
transfer to modules.
That is, the DP slaves must start up within the set time and be configured by the CPU (as DP
master).
PROFIBUS address of the DP master
For the DP CPU, you must not set "126" as a PROFIBUS address.
8-26
Step 7 Online Help
S7-300, CPU 31xC and CPU 31x: Installation
Operating Instructions, Edition 08/2004, A5E00105492-05
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic s7-300 cpu 312cSimatic s7-300 cpu 313c-2 dpSimatic s7-300 cpu 314c-2 ptpSimatic s7-300 cpu 314c-2 dpSimatic s7-300 cpu 312Simatic s7-300 cpu 31 series ... Show all

Table of Contents