Water Installation; Installation; Standard Installation - STIEBEL ELTRON PEY 18 Operation And Installation

Electronically controlled comfort instantaneous water heater
Hide thumbs Also See for PEY 18:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

iNSTallaTiON

installation
Note
f Mount the appliance on the wall. The wall must have
f
sufficient load bearing capacity.
9.2

Water installation

- No safety valve is required.
- Safety valves are not permissible in the DHW pipe.
f Flush the water line thoroughly.
f
f Ensure that the flow rate for switching on the appliance is
f
achieved (see chapter "Specification / Data table", On). If the
flow rate is not achieved, remove the flow limiter (see chap-
ter "Installation / Removing the flow limiter").
f Increase the mains water pressure if the required flow rate is
f
not achieved with the draw-off valve fully opened.
Taps
Use appropriate pressure taps. Open vented taps are not per-
missible.
Note
Never use the shut-off valve in the cold water inlet to
reduce the flow rate. It is intended for shutting off the
appliance.
Permissible water line materials
- Cold water inlet pipe:
Pipes made from galvanised steel, stainless steel, copper or
plastic
- DHW outlet line:
Pipes made from stainless steel, copper or plastic
Material losses
!
If plastic pipework systems are used, take into account
the maximum inlet temperature and the maximum pres-
sure (see chapter "Specification / Data table").
Flexible water connection lines
f If the appliance is installed with flexible water connection
f
lines, ensure that the pipe bends with bayonet fittings do not
become twisted inside the appliance.
f Secure the back panel at the bottom with two additional
f
screws.
www.stiebel-eltron.com
10. Installation

10.1 Standard installation

- Electrical connection from above; installation on unfinished
walls
- Water connection on unfinished walls
- Medium connected load is selected
For further installation options, see chapter "Alternative instal-
lation methods":
- Electrical connection from below on unfinished walls
- Electrical connection on finished walls
- Connecting a load shedding relay
- Water installation on finished walls
- Water connection on unfinished walls for appliance
replacement
- Operation with preheated water
- Temperature limit
Opening the appliance
f Open the appliance by releasing the snap lock.
f
f Remove the back panel by pressing the two locking tabs and
f
pulling the lower section of the back panel forwards.
PEY |
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pey 21Pey 24

Table of Contents