STIEBEL ELTRON PEY 18 Operation And Installation page 8

Electronically controlled comfort instantaneous water heater
Hide thumbs Also See for PEY 18:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
iNSTallaTiON
installation
Preparing the power cable
160
≥ 30
Fitting the wall mounting bracket
f Mark out the holes for drilling using the installation tem-
f
plate. If the appliance is to be installed with water connec-
tions on finished walls, also mark out the fixing holes in the
lower part of the template.
f Drill the holes and secure the wall mounting bracket with
f
2 screws and 2 rawl plugs (screws and rawl plugs are not
part of the standard delivery).
f Fit the threaded stud provided.
f
f Fit the wall mounting bracket.
f
Fitting the cable grommet
f Fit the cable grommet. For connecting cables > 6 mm², en-
f
large the hole in the cable grommet.
8
| PEY
Making the water connection
Material losses
!
Carry out all water connection and installation work in
accordance with regulations.
f Seal and insert the twin connectors.
f
Material losses
!
Never use the shut-off valve in the cold water inlet to
reduce the flow rate.
Preparing the back panel
Material losses
!
If you break open the wrong knock-out in the back panel
by mistake, you must use a new back panel.
f Break out the cable grommet knock-out in the back panel.
f
Deburr any sharp edges with a file if necessary.
www.stiebel-eltron.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pey 21Pey 24

Table of Contents