iNSTALLATiON
installation
Oversink installation
2
1 Cold water inlet
2 DHW outlet
Note
f Mount the appliance on the wall. The wall must have
sufficient load bearing capacity.
9.2
Minimum clearances
≥50
f Maintain the minimum clearances to ensure trouble-free op-
eration of the appliance and facilitate maintenance work.
9.3
Water installation
f Flush the water line thoroughly.
Taps/valves
Use appropriate pressure taps. Open vented taps are not per-
missible.
Permissible water line materials
- Cold water inlet line:
Pipes made from galvanised steel, stainless steel, copper or
plastic
- DHW outlet line:
Stainless steel pipe, copper pipe or plastic pipe
Material losses
!
If plastic pipework systems are used, take into account
the maximum inlet temperature and the maximum per-
missible pressure.
www.stiebel-eltron.com
1
≥50
Flow rate
f Ensure that the flow rate for switching on the appliance is
achieved.
f Increase the water line pressure if the required flow rate
is not achieved when the draw-off valve is fully open. If
the flow rate is still not achieved, remove the flow limiter
(see chapter "Installation / Installation / Removing the flow
limiter").
10. Installation
factory settings
DHB-E 13 LCD
AU
Internal anti-scalding
Tmax (= 60 °C) Tmax (= 60 °C) Tmax (= 60 °C)
protection
Standard installa-
DHB-E 13 LCD
tion
AU
Electrical connection
x
from below on unfin-
ished walls
Water connection, in-
x
stallation on finished
walls
For further installation options, see chapter "Alternative instal-
lation methods".
10.1 Standard installation
Opening the appliance
f Open the appliance by holding the fascia at the side and pull-
ing forwards away from the appliance cover. Undo the screw.
Pivot open the appliance cover.
f Remove the back panel by pressing the two locking tabs and
pulling the lower section of the back panel forwards.
DHB-E 18 LCD
DHB-E 27 LCD
AU
AU
DHB-E 18 LCD
DHB-E 27 LCD
AU
AU
x
x
x
x