Operating Instructions; Operation; Lighting Instructions; Pilot And Burner Inspection - Vermont Castings Radiance RADVT Series Installation & Operating Manual

Direct vent gas heater
Table of Contents

Advertisement

4

Operating Instructions

A. Operation
The Radiance is operated with the front plate in place with the
doors open or closed. To open the front doors, pull forward
to separate the magnetic catch. Ensure the safety barrier
screen is in place during operation.
B. Lighting Instructions
Read these instructions carefully and familiarize yourself with
the lighting instructions. Section F, "Lighting and Operating
Instructions". Locate the pilot assembly, Figure 4.1. Follow
the lighting instructions in this manual exactly.
During the first fire, it is not unusual to smell some odor
associated with new logs, paint and metal being heated.
Odors should dissipate within the first eight to ten hours,
however, you can open a window to provide fresh air to
alleviate the condition.
C. Pilot and Burner Inspection
Each time you light your heater check that the pilot flame and
burner flame patterns are as shown in Figure 4.2. If flame
patterns are incorrect, turn the heater off. Contact your dealer
or a qualified gas technician for assistance. Do not operate
the heater until the pilot flame is correct.
Follow regular maintenance procedures as described in the
Cleaning and Maintenance section of this manual.
Pilot Assembly
Figure 4.1 - Pilot Assembly location.
D. Flame Characteristics
It is important to periodically perform a visual check of the
pilot and the burner flames. Compare them to Figure 4.2. If
any of the flames appear abnormal, call a service person.
2626
ST477a
Stardance
pilot location
10/4/00
Vermont Castings • Radiance RADVT Installation Manual_R4 • 04/19
RADVT MODELS
RADVT-IFT
Figure 4.2 - Correct pilot and burner flame appearance.
E. Flame & Temperature Adjustment
For RADVT models which are equipped with HI/LO valves,
flame adjustment is accomplished by rotating the HI/LO
adjustment knob located near the center of the gas control
valve, Figure 4.3.
Turn
counterclockwise
to increase
flame height
CO105d
Figure 4.3 - Flame adjustment knob for SIT valve.
Pilot flame
FP390
6/07 djt
FLAME ADJUSTMENT KNOB
11/21/96
LG490
all logs
6/07
Turn clockwise
to decrease
flame height
3-90-30007498

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents