Setting Up Vector - Compulite Vector Violet User Manual

Lighting console
Table of Contents

Advertisement

Compulite
Chapter 1

Setting up Vector

1.
Place the console on a clean, stable, and level surface.
2.
Make sure the voltage selection switch, located on the power supply,
is correctly set to 230V AC or 110V AC.
3.
Connect the Vector to the mains supply using the cable supplied.
4.
Connect any peripherals to their connectors on the back panel. All
connectors are labeled with names and standard icons.
5.
Switch on the power, using the switch located on the power supply
on Vector's back panel. The soft switch located on the front of the
console is lit.
6.
Open the door protecting the soft switch, on the front of the
console, and press the switch once. Wait for Vector to complete boot
up.
7.
Connect the DMX cables to the appropriate ports.
IMPORTANT!
600VA) to protect your work and the console.
To shutdown Vector
1.
Press the soft switch located on the front of the console.
2.
Tap
Vector shuts down.
4
It is strongly recommended to use a UPS (minimum
in the
Turn Off
Turn Off Computer dialog
box.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Vector Violet and is the answer not in the manual?

This manual is also suitable for:

Vector ultra violet

Table of Contents

Save PDF