Electrical Installation - Culligan G1 Series Installation, Operation And Service Instructions

Reverse osmosis water treatment systems
Table of Contents

Advertisement

CAUTION!
Observe the precautions listed below before the electrical installation of your GROC
controller. Failure to do so might cause permanent damage to the RO controller.
Electrical Installation of G1 RO Controller
Pre-Installation Recommendations
• Follow the local electrical code requirements.
• Be sure electrical power is off and disconnected at the source before completing any wiring/cabling connections.
• DO NOT include the GBE wiring cables in any conduit or raceway containing other 120-volt or higher circuits.
• Maintain a distance of at least 10 feet between the GBE controller and any electrical distribution panels, raceways
carrying 300 volts or more.
• Use the cabling provided. Failure to do so may affect performance of the GBE controller adversely.
Series G1 Electrical Installation
To open the control panel, loosen the two screws and carefully open the cover by rotating it to the left.
Series G1 Controller
Plugged
Incoming Power
Motor
Cat. No. 01021713
Figure 54.
G1 controller connections.

Electrical Installation

Flow Meter 2
Flow Meter 1
Pressure Switch
To Drain Solenoid
To Inlet Solenoid
TDS Cable
Electrical Installation