Advertisement

Quick Links

English (GB) Installation and operating instructions
Original installation and operating instructions.
CONTENTS
1.
2.
3.
3.1
4.
4.1
4.2
4.3
5.
5.1
5.2
5.3
6.
6.1
7.
8.
9.
9.1
9.2
9.3
9.4
9.5
10.
11.
12.
13.
14.
Warning
Prior to installation, read these installation and
operating instructions. Installation and operation
must comply with local regulations and accepted
codes of good practice.

1. Symbols used in this document

Warning
If these safety instructions are not observed, it
may result in personal injury!
If these safety instructions are not observed, it
Caution
may result in malfunction or damage to the
equipment!
Notes or instructions that make the job easier
Note
and ensure safe operation.

2. General description

Grundfos pumping stations are pre-fabricated pumping stations
for collection and pumping of drainage water, rainwater or
wastewater.
The pump pit is made of PE-HD (polyethylene) and comes with
discharge pipes and valves fitted.
The pipework is made of PE or stainless steel depending on the
location of the pit and the pumped liquid, and thus the pump
selected.
Unless another solution is selected, the pits up to ∅1000 mm are
supplied with a PE-HD cover which is locked with a special M10 bolt.
6
9
Page
7
6
6
6
6
4
6
7
7
7
7
2
7
9
9
1
9
9
9
Fig. 1
Example of version
9
9
Pos.
Description
10
11
1
Pump
12
2
Chain
12
3
Guide rails
12
12
4
Float switch
12
5
Non-return valve
12
6
Stop valve
12
7
Flange/coupling
13
13
8
Connection, 1/2" internal thread
13
9
Cover
13
13

3. Applications

14
Grundfos pumping stations are used for collection and pumping
14
of drainage water, rainwater and wastewater. Wastewater is led
14
into the pit. When the liquid in the pit reaches the starting level,
14
the pump will start and pump the liquid further in the system to a
sewage treatment plant or sewer.
The pits are prepared for various pumps depending on the
pumped liquid.

3.1 Pumped liquids

Drainage water
rainwater (surface water)
wastewater.
3.1.1 Liquid temperature
Maximum 40 °C. For higher temperatures, contact Grundfos.
The liquid temperature depends on the pump
Caution
selected. See the installation and operating
instructions of the individual pumps.
3.1.2 Acids and alkalis
The pump pit is resistant to strong acids and alkalis as well as
solvents.
The pumps are supplied with the pump pit and normally stand pH
values between 4 and 10. In case of doubt, contact Grundfos.
3.1.3 Viscosity
Very thick wastewater must not be led into the pit. See also the
installation and operating instructions of the pump.
3.1.4 Density
Maximum 1.1 tons/m
3
.
8
5
3

Advertisement

Table of Contents
loading

Summary of Contents for Grundfos PUST04

  • Page 1: Table Of Contents

    The pumps are supplied with the pump pit and normally stand pH values between 4 and 10. In case of doubt, contact Grundfos. 2. General description 3.1.3 Viscosity Grundfos pumping stations are pre-fabricated pumping stations Very thick wastewater must not be led into the pit.
  • Page 2: Identification

    4. Identification 4.2 Type key, PUST17 4.1 Type key, PUST04 - PUST10 Example PUST 17. 45. D. A. SS. DC. PE. Grundfos pumping station Example PUST 08. 20. S. A. SS. SEG (standard) Grundfos pumping station (standard) Diameter [mm] Diameter [mm]...
  • Page 3 Fig. 3 Pit with free-standing pump Fig. 4 Pit with pump on auto coupling Fig. 5 Pit with pump on wall-mounted auto coupling Fig. 6 Pit with two pumps...
  • Page 4: Cover

    The pit must be locked to prevent unwanted access. 5.2 Vent pipe We recommend to provide the pit with a vent pipe. Fig. 10 Lifting the pit (PUST04 - PUST10) Fig. 9 Pit with vent pipe 5.3 Cables The cables to the level switches and the pump can be led into the pit in different ways.
  • Page 5: Installation

    Check the pit for external damage before lowering it into position. When the pit has been Note installed, Grundfos cannot be held responsible for possible damage. Place the pit on the bedding layer. Check that the pit is vertical.
  • Page 6: Pipe Connection

    91712032 - 2/+ 1 91712025 of the hole is not an issue. See fig 17. Pilot drill 91712026 9.1.1 PUST04 - PUST10 We recommend to drill the inlet in the cylindrical, smooth part. Fig. 15 Drilling the inlet, ∅400-1000 mm...
  • Page 7: Fitting The Sleeve

    9.2 Fitting the sleeve 9.4 Pipework with flange connections 1. Fold the sleeve and insert it into the hole (from the outside of If the pit is to be installed at a temperature below the pit). 0 °C, slacken all bolts of the flange and retighten Note 2.
  • Page 8: Float Switches

    10.3 Float switches 10.4 Rod electrodes If float switches have been selected, they can be fitted on a tube If rod electrodes are used for level measurement, note that the which can be lifted out of the pit. This ensures easy adjustment of rods come in standard length (1 m).
  • Page 9: Electrical Connection And Start-Up

    1. Use the public or private waste collection service. 2. If this is not possible, contact the nearest Grundfos company or service workshop. 3. If it is not possible to dispose of the product as a complete unit, the pump installation can be removed from the pit, and the pit can be filled and covered.

This manual is also suitable for:

Pust17Pust10

Table of Contents