Mains Supply; Connecting Peripheral Equipment; Initial Start-Up - KERN MLB50-3 Operating Instructions Manual

Moisture analyzer
Table of Contents

Advertisement

6.2

Mains supply

A mains cable is used for the electric power supply.
Please check whether the balance voltage intake has been set correctly. The balance
may only be connected to the mains supply if the details on the balance (label) and
the customary on-site mains voltage are identical.
Important:
Does the designation (220 V 50 Hz) comply with the customary on-site mains voltage?
Do not connect if there are differences in the mains voltage!
-
The balance may be connected if in compliance.
-

6.3 Connecting peripheral equipment

The balance must be disconnected from the mains before connecting or disconnect-
ing additional equipment (printer, PC) to or from the data interface.
Only use KERN accessories and peripheral equipment with your balance. These
have been ideally coordinated to your balance.

6.4 Initial start-up

The accuracy of the balance depends on the local acceleration of the fall.
Please be sure to observe the information in the chapter on "adjusting".
Use the main switch (above the power plug) to switch on the balance. "tEmP "
will appear.
You have two choices:
1. Press the
key, the balance will run through a "tEst " mode. "0.000 " will appear
on the display screen after a few seconds. A short warm-up period of approx. 10
minutes is advisable for stabilisation purposes.
2. It is possible to start up a pre-heating process that pre-heats the weighing region
to a reasonable drying process temperature. This pre-heating process is only practi-
cal before initial drying if there are to be several consecutive drying procedures.
This procedure can be triggered whilst "tEmP " is on the display screen by operating
the
key. The balance switches automatically to weighing mode after a few
minutes.
Use the
key to enter weighing mode.
36
MLB50-3-BA-defsi-0310

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents