6.2.1 Scope of delivery

Serial accessories:
• Moisture analyzer, see illustration chap. 2
• 10 sample dishes
• Power cable
• Operating manual

6.3 Mains connection

Power supply is provided via the supplied mains cable.
Check, whether the voltage acceptance on the scales is set correctly. Do not connect
the scales to the power grid unless the information on the scales (sticker) matches
the local mains voltage.
Important:
Does the rating match the standard local mains current?
Do not connect if mains voltages are different!
-
If matching, connect the scales.
-
The moisture analyzer must be connected to a standard socket with earth terminal.
Do not eliminate the protective effect by using an extension lead without earth
terminal. For power supplies from power grids without earth terminals call a specialist
to establish equivalent protection according to the relevant installation regulations.

6.4 Switch on/switch off device

Press the ON/OFF key. The unit will carry out a self-test. The device is ready for
measuring as soon as 0.000 g appears on the weighing display. If the display
deviates from zero, operate the TARE key.
For short pauses in measurement, switch off device at ON/OFF switch and do not
disconnect from mains.

Stability display

If the display shows the stability display [
status is instable the [

Balance zero display

Should the balance not display exactly zero despite empty balance pan, wait for
stability display and press the TARE button. The balance start with resetting to zero
and the symbol "a" will appear.
MLB_C-BA-e-1431
] the balance is in a stable status. If the
] display disappears.