Permanent Installation Instructions - Kenmore 110.4443 Series Use & Care Manual

Compact washer
Table of Contents

Advertisement

Available languages

Available languages

Drain System
The washer can be installed using the standpipe drain system
(floor or wall), the laundry tub drain system, or the floor drain
system. Select the drain hose installation method you need.
See "Tools and Parts."
Standpipe drain system – wall or floor (views A & B)
The standpipe drain requires a minimum diameter standpipe
of 2" (50 mm). The minimum carry-away capacity (for permanent
installations) can be no less than 17 gal. (64.5 L) per minute.
The top of the standpipe must be at least 39" (990 mm) high
and no higher than 72" (183 cm) from the bottom of the washer.
4.5"
(114 mm)
4.5"
4.5"
(114 mm)
(114 mm)
Laundry tub drain system (view C)
The laundry tub requires a minimum carry-away capacity
of 17 gal. (64.5 L) per minute (for permanent installations).
The top of the laundry tub must be at least 39" (990 mm) above
the floor and no higher than 72" (183 cm) from the bottom of
the washer.
4.5"
4.5"
(114 mm)
(114 mm)
A
B
min.
min.
39"
30"
(990 mm)
(762 mm)
C
PERMANENT INSTALLATION
INSTRUCTIONS
Install Leveling Feet – Optional
(for permanent installation only)
IMPORTANT: Installation of the leveling feet is permanent.
Once the leveling feet are installed into the base of the washer,
they cannot be removed and the washer wheels will no longer be
able to roll.
1.
Install leveling feet
Lay washer on its back. Push in to snap the large black rubber
foot into the right front corner of the washer base. Repeat to
install the remaining leveling feet on the other 3 corners.
Front
Large
black
rubber
foot
7

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents