Lifting and lowering
Operating time per day
Days per inspection interval
Tab. 45
Calculation
10 • 4 • 8 • 250
T
=
i
Tab. 46
With operating time read: 334
With estimated operating time: 333,3
In the operating time as read/estimated above, the chain hoist has transported the following loads:
Fig. 35
B
Loading
Tab. 47
Adding the load spectrum modules k
Thus, the actual duration of service amounts to S [h] = k
● With operating time read 0,119 x 334 x 1,1 = 43,72
● With estimated operating time 0,119 x 333,3 x 1,2 = 47,6
For classification in FEM group of mechanisms 1Am (see DC-Com data plate) with a theoretical duration of serv‐
ice of 800 hours (see table below) the hoist has a theoretical remaining duration of service of
● With operating time read 756,28 hours
● With estimated operating time 752,4 hours
Documentation:
Enter these values in your test and inspection booklet or crane installation test and inspection booklet. This entry
may appear as follows:
Date
Operating hours
From
To
T
value
i
[h]
3.1.-
30.12.-
Read 334
3.1.-
30.12.-
Estimated 333,3
Tab. 48
60 • 4
L
Load
together results in the load spectrum factor k
m
Load [%] km factor
full
3/4
1/2
1/4
5
10
20
15
0,05
0,042
0,025
0,002
5
10
20
15
0,05
0,042
0,025
0,002
(2+2) m/cycle = 4 m/cycle
8 h/day
250 days/inspection interval
t
x T
x f =
mi
i
Load spec‐
Actual dura‐
trum factor
tion of serv‐
none
k
f
mi
50
0,119
1,1
43,72
-
50
0,119
1,2
-
Time
= 0,119
mi
Theoretical
Remaining
duration of
use
ice
service
Use
S
D [h] Group
D - S
[h]
of mech.
[h]
800/1Am
756,28
47,6
800/1Am
752,4
67