10. Replace any adapters that were removed.
11. Install the adapter airflow guide:
12. Replace the support bracket and side cover. (See "Removing and installing the
13. Connect all external cables; then, connect the power cords.
14. Turn on the server.
15. Start the Configuration/Setup Utility program and set configuration parameters
38
IBM xSeries 225 Type 8647: Option Installation Guide
b. Slide the adapter airflow guide out of the guides on the air baffle and on
the front adapter-support bracket; then, remove it from the chassis.
7. Remove any adapters that impede access to the battery.
8. Remove the battery:
a. Use a fingernail to press the top of the battery clip away from the battery.
The battery pops up when released.
b. Use your thumb and index finger to lift the battery from the socket.
9. Insert the new battery:
a. Tilt the battery so that you can insert it into the socket on the side opposite
the battery clip.
b. Press the battery down into the socket until it clicks into place. Make sure
the battery clip holds the battery securely.
a. Rotate the front and rear adapter-retention brackets to the open (unlocked)
position.
b. Slide the adapter airflow guide into the guides on the air baffle and front
adapter-support bracket; then, push it into place, using care to not damage
any cables.
c. Rotate the front and rear adapter-retention brackets to the closed (locked)
position.
support bracket" on page 12 and "Replacing the bezel" on page 39.)
as needed. See the User's Guide on the IBM xSeries Documentation CD.