Priming The Unit - Mira Advance ATL Thermostatic Installation & User Manual

Adjustable temperature limit thermostatic electric shower 9.0 and 9.8 kw
Hide thumbs Also See for Advance ATL Thermostatic:
Table of Contents

Advertisement

17.
IMPoRTAnT!

Priming the unit

19.
refit Splash Guard and
connect ribbon cable to the
inside of the cover.
21.
do not use alternative screws
to secure cover. This can
cause internal damage to the
appliance. do not seal around
any part of the appliance.
Make sure electricity
is isolated!
push down
and hold air bleed button
to prime appliance until
water appears from
Failure to
shower head.
prime will seriously
a f f e c t
s h o w e r
performance!
dry off
water before connecting/
reinstating electricity.
18.
Feed cable into case. Fit earth
sleeve and strip insulation.
Firmly connect the conductors.
do not exert strain on terminal
block.
20.
Refit Cover. Inserts are
provided to finish the top and
bottom as required.
22.
Install shower fittings. Refer
to separate Installation and
User Guide.
15
L = broWn
e = Green
n = bLUe

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents