Installation - Mira Advance ATL Thermostatic Installation & User Manual

Adjustable temperature limit thermostatic electric shower 9.0 and 9.8 kw
Hide thumbs Also See for Advance ATL Thermostatic:
Table of Contents

Advertisement

refer to section: "Important safety Information" first.
This installation covers all models of the Mira Advance ATL Thermostatic
shower.
1.
electrical supply is
turned off at the mains.
4.
remove cover and
Splash Guard. determine
supply pipe position and
if required cut a slot in the
case for the rising supply.
7.
complete any soldering
required away from
appliance.

InsTALLATIon

2.
determine unit position.
Leave appropriate
spaces for maintenance.
5.
Make provision for Signal
cable to connect to Shower
drain pump (if applicable).
also refer to Whale drain
pump instructions.
8.
Flush a minimum of
10 litres (2 gallons)
through pipework prior to
connection.
13
100 mm
3.
remove cover Screw.
6.
Turn Inlet connector to
suit supply pipe.
Do not trap green wire.
9.
When fitting to a tap
connection, use adaptor
(supplied). Do not fit fibre
washer.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents