Prepare Site for the Arrival of the Equipment

Procedure to Prepare the Site
for the Equipment
Step
1
If some type of protective padding is available install it around any existing equipment at the site
that could be damaged during installation of the units.
2
Hang plastic sheets around intended work areas to prevent dust and debris from damaging
co-located equipment during installation.
3
Secure any fluorescent tubes in place using masking tape. (Refer to Figure 2-1.)
NOTE
This will prevent the tubes from being inadvertently jarred from the fixtures during the
installation of equipment or cables.
4
Locate the demarcation blocks for external utilities.
Verify that they are shown on the Site Engineering documents, and determine the required cable
routing back to the equipment frames.
5
Verify the following:
S
DC power is available and meets the site documentation specifications (if applicable).
S
AC power is available and meets the site documentation specifications (if applicable).
S
Cable rack is installed per site document specifications.
S
Outdoor cable runs are installed and meet local building codes.
S
Span line termination tie points are available.
S
Customer input termination tie points are available.
S
Phone tie-in points (modem) are available.
S
Phone access is available (if applicable).
S
There is clear access to move the equipment to the desired mounting area.
S
There is sufficient space for installation and service access to the equipment.
S
Customer supplied shelters are installed.
JAN 2002
SCt300 1X BTS Hardware Installation, ATP, and FRU Procedures
Table 2-1: Procedure to Prepare the Site for the BTS
– continued
Action
DRAFT
2
2-7

Advertisement

Table of Contents
loading

Table of Contents