Motorola SC 300 Installation Manual page 58

1x bts hardware installation, atp, and fru procedures
Hide thumbs Also See for SC 300:
Table of Contents

Advertisement

Installation and ATP Order
1
Frequency Hopping Pilot
Beacon (FHPB) ATP Order
1-28
– continued
11. Test equipment setup (test set calibration/GPIB address & clock
setup)
12. Test equipment selection
13. Power meter calibration
14. Test cable calibration
15. Create CAL file
16. RF path audit
17. TX and RX acceptance tests
18. Subscriber unit test and setup
19. Generate an ATP report
20. Copy LMF CAL file to CBSC
21. Terminate LMF session/leave the site
The ATP for a MicroCell that is configured as a Frequency Hopping
Pilot Beacon is performed in the following sequence:
1. Create CAL file
2. RF path audit
3. TX and RX Acceptance tests
4. Generate an ATP Report
5. Copy LMF CAL file to CBSC
6. Terminate LMF session/leave the site
SCt300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
DRAFT