Introduction

Scope of This Document

Manual Order

JAN 2002
SCt300 1X BTS Hardware Installation, ATP, and FRU Procedures
This document provides information pertaining to the hardware
installation, cabling installation, ATP and Field Replaceable Unit (FRU)
procedures of the Motorola MicroCell SCt300 CDMA Base
Transceiver Subsystem (BTS) equipment.
The FRU procedures do not cover the replacement of modules inside the
unit.
An individual SCt300 BTS unit will be referred to as the "unit" for the
remainder of this document. A site that contains one or more SCt300
units will be referred to as the "Logical BTS" or "Multi–Unit BTS" for
the remainder of this document.
For detailed installation information of non-Motorola equipment, refer to
the vendor manuals provided with such equipment.
The installation order is the order of the manual starting at Chapter 1 and
continuing through Chapter 5. After hardware installation has been
completed, run the ATP for the system by following the procedures
defined in Chapter 6 of this manual.
Chapter 1
"Introduction" — This is a brief outline of the manual. Also provided is
a list of additional documents and tools necessary to complete the
procedures.
Chapter 2
"Site Preparation" — This chapter contains the necessary information to
verify the condition of the site.
Chapter 3
"Installing Mounting Bracket and Remote GPS" — This chapter
contains the necessary information to install the MicroCell and Surge
Suppressor mounting bracket on a wall, pole, or rack.
Chapter 4
"Preparing Site Cabling for Sites Equipped with Customer–Supplied
Site I/O Interface" — This chapter contains the procedures for installing
the external cabling for sites equipped with the customer–supplied Site
I/O interface.
Chapter 5
"Preparing Site Cabling for Sites Equipped with Optional Primary Surge
Suppressor" — This chapter contains the procedures for installing the
external cabling for sites equipped with the optional Primary Surge
Suppressor.
Chapter 6
"Installing the Unit and Installation Check Off List" — This chapter
contains procedures for installing the unit, mounting the Solar Cover to
the chassis and final Installation Check Off List.