ATP Tools and Materials
JAN 2002
SCt300 1X BTS Hardware Installation, ATP, and FRU Procedures
– continued
Span line (T1/E1) verification equipment
As required for local application.
RF test cable (if not provided with test equipment)
Motorola model TKN8231A. Used to connect test equipment to the
BTS during ATP or general troubleshooting procedures.
Oscilloscope
Tektronics model 2445 or equivalent. Used for waveform viewing,
timing and measurements during general troubleshooting procedures.
CDMA subscriber mobile or portable radiotelephone
CDMA compatible with power supply and antenna. Used to provide test
transmission and reception during BTS maintenance and
troubleshooting. Two radios will be required for system and drive
around testing after BTS installation and optimization.