NetAXS™ NX4L1 Installation Guide
NetAXS Startup
6.0 NetAXS Startup
6.1 LED Operation
When the panel wiring is complete, turn on the power. It might take a few minutes for the panel to
complete the power-up sequence. When the board does initialize, verify that the appropriate LEDs
identified in the following figure are in accord with the descriptions in
Figure 34: System, Relay and Power LEDs
58
www.honeywell.com
(Ethernet)
LINK
COM
H485
Run
(Host RS485)
RDR 1
(Readers)
RDR 2
(Relays)
RLY
DS
(Host RS232
and
Downstream)
H232
(Relays)
RLY
PWR
(Power)
Table 7
on page 59.
RDR
(Readers)
RDR