8 Procedures for Starting Operation

8.
Procedures for Starting Operation
The procedures for starting operation with the Anybus-CompactCom module are shown below.
In this example, the 2F-DQ535 card and the PLC are connected one-on-one with an Ethernet cable, and
an operation to confirm the I/O signal is performed.
For more information on the PLC, refer to the manual enclosed with the PLC.
Table 8-1 Example of equipment on the master station side
8-26 Wiring
Set the master side parameters.
Set the robot controller side parameters.
Turn the power ON in the following order:
(1) Turn the master side power ON.
(2) Turn the robot controller power ON
Confirm that a network base card related error is not
occurring in the robot controller.
Confirm that the I/O signals operate normally.
Output a signal forcibly from the robot and check it
on the monitor of the master station side
Create the robot program.
Start the system
Completed
Figure 8-1 Procedures for starting operation
Master
Mitsubishi Electric
station
MELSEC iQ Q03UDVCPU
equipment
QJ71GF11-T2
Software
GX Works2 engineering software
used
Start
CC-Link IE Field
CC-Link IE Field
... See Section 8.1.
... See Section 8.1.
... See Section 8.2.
... See Section 8.3.