Section 3: Setup; Preparation; Unpacking; Needed For Setup - Grizzly G0806 Owner's Manual

Variable-speed vertical metal-cutting bandsaw
Table of Contents

Advertisement

Preparation

The list below outlines the basic process of pre-
paring your machine for operation. Specific steps
are covered later in this section.
The typical preparation process is as follows:
1.
Unpack the machine and inventory the con-
tents of the box/crate.
2.
Clean the machine and its components.
3.
Identify an acceptable location for the machine
and move it to that location.
4.
Level the machine and either bolt it to the
floor or place it on mounts.
5.
Assemble the loose components and make
any necessary adjustments or inspections to
ensure the machine is ready for operation.
6.
Connect the machine to the power source.
7.
Test run the machine to make sure it func-
tions properly and is ready for operation.

Unpacking

This machine was carefully packaged for safe
transport. When unpacking, separate all enclosed
items from packaging materials and inspect them
for shipping damage. If items are damaged,
please call us immediately at (570) 546-9663.
IMPORTANT: Save all packaging materials until
you are completely satisfied with the machine and
have resolved any issues between Grizzly or the
shipping agent. You MUST have the original pack-
aging to file a freight claim. It is also extremely
helpful if you need to return your machine later.
Model G0806/G0807 (Mfd. Since 12/15)

SECTION 3: SETUP

SUFFOCATION HAZARD!
Keep children and pets away
from plastic bags or packing
materials shipped with this
machine. Discard immediately.

Needed for Setup

The following are needed to complete the setup
process, but are not included with your machine.
For Lifting and Moving:
— A forklift or other power lifting device rated
for at least 1200 lbs.
— Lifting strap or chain w/safety hook rated
for at least 1200 lbs.
For Power Connection:
— A power source that meets the mini-
mum circuit requirements for this machine
(review Power Supply beginning on Page
12 for details).
— An electrician or qualified service person-
nel to ensure a safe and code-compliant
connection to the power source.
For Assembly:
— Shop Rags
— Cleaner/degreaser
— Safety Glasses for Each Person
— Oil Can with any General Machine Oil
— Blade Tension Tool
— Grease Gun with any API GL 2 Grease
— Stiff Grease Brush
— Phillips Screwdriver #2
— Floor mounting hardware (see Page 22)
— Hex Wrench 5mm
— Hex Wrench 6mm
— Open-End Wrench
Socket)
— Open-End Wrenches 13mm and 17mm
— Additional Person
" (or Ratchet and
"
1
1
2
2
-19-