Preparations for use
4.2 Transport and storage
①
④
Figure 4-2
Table 4-1
Type
1PH818.
1PH822.
1PH828.
Transporting a motor that has been in operation
If you have already operated the motor and now want to transport it, proceed as follows:
1. Allow the motor to cool down.
2. Remove the connections provided by the customer.
3. Drain the cooling-water system and purge it carefully with air.
4. Fit the rotor shipping brace.
5. Always use only the lifting eyebolts on the bearing end shields to transport and lift the
4.2.2
Storage
The motors can be stored for up to two years in dry, dust-free and vibration-free rooms
without reducing the specified storage time.
24
Sleeve
Shaft screw
Rotor shipping brace
Tightening torque for rotor shipping brace
Thread in the shaft end
M20
M20
M24
motor.
Tightening torque
50 Nm
50 Nm
100 Nm
Siemens AG Operating Instructions V1.0 1PH8
Preload
12 kN
12 kN
20 kN
A5E02605207A AA