Adjusting The Legs On Slb-U; Aligning The Slb-U (As Shipped) On A Projector With 4 Mounting Holes - CHIEF Universal Smart Lift Bracket Installation Instructions Manual

Table of Contents

Advertisement

Installation Instructions
STEP 2

Adjusting the Legs on SLB-U

The mounting holes on projectors are supplied in a
variety of different patterns. There is no standard
mounting-hole configuration pattern for projectors.
The SLB-U will generally accommodate the mounting-
hole pattern on most projectors, providing that the SLB-U
adjustable legs can be configured to match the mounting
holes on your projector.
Due to the number of configurations that the SLB-U can
accommodate, this instruction guide only provides
guidance for the three most commonly used SLB-U
configurations on projectors. Select the applicable
procedure to mount the SLB-U on your projector:
Step 2 (Option A). Align the SLB-U on a projector
with 4 mounting holes.
Step 2 (Option B). Align the SLB-U on a projector
with 3 mounting holes.
Step 2 (Option C). Align the SLB-U on a projector
using horizontal slot and 3 mounting holes.
Step 2 (Option D). Align the SLB-U on a projector
using direct mounting option.
STEP 2 (OPTION A)
Aligning the SLB-U (as shipped) on a Projector
with 4 Mounting Holes
Align the SLB-U on the projector, as follows:
1. Locate the four mounting holes on your projector.
2. Using a Phillips screwdriver, loosen the four screws.
Do not remove the screws.
NOTE: If necessary, use the measurements that you
recorded when you completed Step 1,
"Measuring the Mounting Holes On Projector" to
help align the adjustable legs with the mounting-
hole pattern on the projector.
3. Align the SLB-U on projector, as follows:
a. Place the SLB-U (10) on your projector.
b. Adjust the legs on the SLB-U (10) as needed.
Align the adjustable legs on the SLB-U with
mounting holes on your projector.
6
4. Attach the SLB-U to the projector, as follows:
a. Select the screw size that fits the threaded inserts
on your projector (see Table 3).
b. Select the washer that fits the selected screw.
c. Attach the SLB-U to the projector using the
selected fasteners in accordance with Table 3. Do
not tighten the screws at this time.
5. Attach the SLB-U to RPA (see Figure 2).
Table 3. SLB-U Mounting Hardware
ITEM
DESCRIPTION
20
6
12
M
X
MM SCREW
30
5
12
M
X
MM SCREW
40
4
12
M
X
MM SCREW
50
3
10
M
X
MM SCREW
60
6
M
FLAT WASHER
70
4
M
FLAT WASHER
10-24
80
THUMB NUT
10
Figure 7. Align the SLB-U on 4-Hole Projector
SLB-U
QTY
NOTES
4
60
USE ITEM
WITH
20
30
ITEMS
AND
4
4
70
USE ITEM
WITH
40
50
ITEMS
AND
4
4
4
USE TO ATTACH
4
-
SLB
U TO RPA
Loosen screws. Adjust legs
on SLB-U, as needed. Align
legs on SLB-U with
mounting holes on projector.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Slb-u

Table of Contents