Main Unit Preparation - Sharp SD-AS10 Operation Manual

1-bit digital home theater with dvd player
Hide thumbs Also See for SD-AS10:
Table of Contents

Advertisement

Main unit preparation

Select from three installation methods according to the location.
For position A or B, make sure to use the included main unit stand. Otherwise the unit may fall.
The display direction changes according to the installation direction.
Position A
1 Remove the 2 screws.
2 Secure the stand with the removed screws.
Main unit stand
Notes:
! When attaching the stand, place the main unit on a cushion or soft cloth to avoid
damage.
! Use the removed screw to secure the stand. Otherwise, the unit may break.
Position B
L
R
SW
1 Remove the 2 screws.
Make all connections
before attaching the
stand (see pages 17,
19).
2 Secure the stand with the removed screws.
YES
NO
Correct
Position C
L
R
SW
1 Align the position with the remote sensor
and attach the included button name label.
Remote
sensor
2 Fit the non-slip sheets into the groove.
Main unit stand
Correct
Caution:
! Do not change the installation direction when the main unit is turned on. Discs may
not be read or may be damaged.
! Remove the only specified screws. Malfunction may occur. Be careful not to lose
the removed screws.
! To turn on the power after the first installation or after changing the installation
method, use the POWER button on the main unit. From the next time, you can also
use the remote control.
L
R
SW
Button name label
Non-slip sheet
for main unit
YES
NO
SD-AS10
15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SD-AS10 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Cp-as10fCp-as10cCp-as10rCp-as10w

Table of Contents