3.4.2.2
Smart Line Module
First commissioning: infeed
Table 3- 3
Cabinet Modules Operator Panel AOP30
Operating Instructions, 04/2014, A5E03263551A
Data input with infeed via a Smart Line Module
3.4 Initial commissioning
• Input of the supply voltage in V.
• Input of the source of the ON/OFF1
command.
Navigate within the selection fields with
<F2> and <F3>.
Activate your selection with <F5>.
Once you have entered the final value,
choose "Continue" to exit the screen.
Commissioning
23