Set-up and Initial Commissioning
8
Connecting the plug-in connections and ground cable
.02
Fig. 8 - 03
Insert all plugs on the control box 2 in accordance with their designation.
Insert the "motor" into the bushing X 3 and the bushing X 8.
Attach the following ground cables in order to discharge static electricity:
Securely attach the ground cable from the sewing head 1 to ground point A.
Securely attach the ground cable from the control point 8 to ground point B.
Securely attach the ground cable from the main switch 3 to ground point C.
Securely attach the ground cable from the stand 4 to ground point D
Securely attach the ground cable 5 from the motor to ground point E
22
2
Caution!
Plugging in the connector incorrectly can damage the control unit!
1
4
D
B
3
E
5
D
C
B
A