Commissioning - unGer Hydro Power RO System RO40C Operating Instructions Manual

Table of Contents

Advertisement

Quality Tools for Smart Cleaning
4.4

Commissioning

To start the HydroPower RO, proceed as follows:
18
Preparing for use
Commissioning
CAUTION
Slight injuries due to pressurized containers possible.
The 4 filter vessels are pressurized during operation.
`
Never open a filter vessel during operation.
`
Check if the hoses and tubes are water-tight and fit properly before
`
commissioning the system.
Use protective gloves.
`
1. Connect the power cord to the power supply.
2. Turn on the main power switch
`
`
3. Connect the hoses.
4. Turn on the water supply and make sure that the unit
5. Turn the on / off knob to the green position. The pump
6. Bleed the HydroPower RO by pressing the button on
www.ungerglobal.com
The start screen appears.
A sequence of images appears in the display, which
reminds you to connect the hoses and bleed the air out
of the HydroPower RO.
is completely filled with water. To check that, press the
yellow pressure buttons. When water comes out, the
vessels are filled.
will turn on.
the front two filters for a few seconds until water is
discharged.

Advertisement

Table of Contents
loading

Table of Contents