Content Quality Tools for Smart Cleaning Introduction ........................ 4 General information ..................... 4 Intellectual and industrial property rights ............4 Property and legal deficiencies ................4 Explanation of signs ..................... 5 1.4.1 Instructions for use ..................5 1.4.2 Enumerations ..................... 5 1.4.3 Hazard classes ....................
Page 3
Content Quality Tools for Smart Cleaning Preparing for use ....................... 15 Construction of the HydroPower RO ..............15 Interfaces ......................15 Transport and storage ..................16 4.3.1 Transportation .................... 16 4.3.2 Storage ...................... 17 4.3.3 Operation the HydroPower RO ..............17 Commissioning ....................
Claims for material and legal deficiencies presuppose that the operator shall submit the defect in writing without delay, but at the latest within two working days. Unger Germany GmbH is in no case responsible for damage to the system itself, or damage caused by the unit due to improper handling of the product.
GmbH. In the corresponding descriptions this will be called „Software“in this manual. Unger Germany GmbH has protective rights to this software. In cases where these rights are owned by third parties, Unger Germany GmbH has the corresponding rights of use.
Introduction Explanation of signs Quality Tools for Smart Cleaning 1.4.3 Hazard classes Safety instructions are shown in this manual with standardized illustrations and symbols. Depending on the probability of the occurrence and severity of the consquence, the following hazard classes are used: DANGER Indicates a hazardous situation that can lead to serious injury or death.
Introduction Explanation of signs Quality Tools for Smart Cleaning 1.4.4 Warning signs Warning of a hazard. Warning of electrical voltage. Warning of overpressure in containers. Warning of hot surfaces. Warning of suspended loads. Warning of injury to the limbs. 1.4.5 Mandatory signs Application tips and other useful information.
Introduction Nameplate Quality Tools for Smart Cleaning Nameplate Each HydroPower RO from Unger Germany GmbH has a nameplate on the side. Pic. 1 Nameplate Obligation of the operator The HydroPower RO is used in the commercial sector. The operator must adhere to the statutory obligations to work safety.
About HydroPower RO Using the HydroPower RO Quality Tools for Smart Cleaning About HydroPower RO Using the HydroPower RO 2.1.1 Intended use The HydroPower RO is used for the filtration of drinking water by demineralisation for the purpose of glass and surface cleaning. The HydroPower RO is intended for commercial use only.
Safety General safety regulations Quality Tools for Smart Cleaning Safety General safety regulations 3.1.1 Basic principles Special safety regulations may apply to certain activities. Safety instructions and warnings are given in the respective sections of the operating instructions. Operate the HydroPower RO only: •...
Before each use, perform a visual inspection of the power cable for damage. If you notice any damage, contact your distributor. Maintenance on the electrical components of the system may only be carried out by employees of Unger Germany GmbH or their authorized specialist dealers / technicians. Thermal hazards Burns due to hot surfaces.
Safety Hazards from materials and substances Quality Tools for Smart Cleaning Hazards from materials and substances The safety data sheets of the materials and substances can be found online at www.ungerglobal.com/downloads-safety-data-sheets. Irritation to the eyes, skin and respiratory tract through carelessness. Avoid any contact with the resin when replacing the DI resin cartridge.
Preparing for use Construction of the HydroPower RO Quality Tools for Smart Cleaning Preparing for use Construction of the HydroPower RO Manometer 1 2 3 Filter selection buttons Display STOP button RO membrane 2 On/Off knob DI resin filter 3 x water outlet Front plate to reach the pump reset 10 Pump ventilation slot 11 Main switch (green: On / red: Off)
Preparing for use Transport and storage Quality Tools for Smart Cleaning Transport and storage 4.3.1 Transport The HydroPower RO is delivered on a pallet by a forwarding company. The HydroPower RO is carefully tested and packaged before shipment. However, damage during transport cannot be ruled out.
Preparing for use Transport and storage Quality Tools for Smart Cleaning 4.3.2 Storage If the unit is not in use for more than 7 days, the membranes must be protected according to the storage instructions, see chapter „7.2.4 Membrane protection“. 4.3.3 Operating the HydroPower RO Carbon/sediment combi pre-filter...
Preparing for use Commissioning Quality Tools for Smart Cleaning Commissioning CAUTION Slight injuries due to pressurized containers possible. The 4 filter vessels are pressurized during operation. Never open a filter vessel during operation. Check if the hoses and tubes are water-tight and fit properly before commissioning the system.
Page 19
Preparing for use Commissioning Quality Tools for Smart Cleaning 7. The system is automatically initialized. The resin is first by-passed. This is followed by a stabilization of the filters, in which a status measurement is carried out, so that all values are displayed correctly. 8.
Operation of the HydroPower RO General information Quality Tools for Smart Cleaning NOTE You can adjust the amount of pure water produced by moving the on / off knob within the blue control range. Centre position = Recommended working position for an optimal membrane life.
Operation of the HydroPower RO Controls, buttons and switches Quality Tools for Smart Cleaning Controls, buttons and switches Manometer Filter selection buttons - PRE: Carbon/sediment combi pre-filter 1 2 3 - RO 1: RO membrane 1 - RO 2: RO membrane 2 - DI: DI resin filter Display STOP button...
Page 22
Operation of the HydroPower RO The settings menu Quality Tools for Smart Cleaning Select the top menu item to set the LANGUAGE: • Press the ENTER button to select. • The current selection is highlighted in yellow. Select the menu item UNITS to set the unit of measure for water.
We recommend regulating the water pressure between the 3 hoses, especially with height differences, with a valve. For example the UNGER hose connection # 18330 incl. water switch or the UNGER HiFloControl # TMOOV, regulate the water quantity at the water fed pole.
Operation of the HydroPower RO Switching off the HydroPower RO Quality Tools for Smart Cleaning Switching off the HydroPower RO When the HydroPower RO is switched off, a self-cleaning process starts. For 1 minute, 100% of the incoming water flows with increased pressure through the RO membrane 1 and the RO membrane 2 and is discharged through the concentrate hose at the rear.
Software Update Quality Tools for Smart Cleaning Software Update On the Unger website, system updates are offered as required. If you have registered there, you will automatically be informed about updates. To perform the software update, proceed as follows: 1. Go to www.ungerglobal.com/ro.
Faults and messages Procedure for malfunctions Quality Tools for Smart Cleaning Procedure for malfunctions The following warning messages may appear in the display during operation: Water pressure too low The inlet pressure from the water line is too low to provide the desired filter performance.
Faults and messages Troubleshooting Quality Tools for Smart Cleaning Overpressure Overpressure can occur when the water pressure from the tap is more than 6 bar. To check the water pressure of the line, proceed as follows: 1. Stop the HydroPower RO by pressing the STOP button. The manometer indicates the line pressure.
DANGER Electric shock possible through live parts. Maintenance on the electrical components of the system should only be carried out by employees of Unger Germany GmbH or their authorized specialist dealers / technicians. CAUTION Burns due to hot surfaces possible.
If the unit will not be in use for more than 7 days, the membrane must be protected according to the storage instructions, see chapter „7.2.4 Membrane protection.“ If the membrane is not regularly flushed or protected with the UNGER membrane care agent, there is a risk of blockage and thus a strong performance limitation or damage.
If the HydroPower RO is not in use for an extended period of time (longer than 7 days), the membrane must be protected against blockage. For this purpose, there is the UNGER Membrane Care Agent (Order No. 15436). You need one bottle (1l) for each membrane. This preserves the current state of the membrane and prevents reduced performance and/or damage after sitting for a longer period of time.
Repair and replacement of parts Quality Tools for Smart Cleaning Repair and replacement of parts You will find a spare part list on the Unger website www.ungerglobal.com/RO with parts that you can change yourself. For any further repairs, please contact your dealer.
Page 32
Maintenance and servicing Repair and replacement of parts Quality Tools for Smart Cleaning 5. Pull out the filter cartridge. 6. Insert a new filter cartridge into the HydroPower RO. With the carbon/sediment combi pre-filter, the flow direction does not matter. After the change, the value must be reset in the menu item FILTER CHANGE, see chapter „9 Evaluation possibilities“.
DANGER Electric shock and burns due to live parts possible. Maintenance on the electrical components of the system may only be carried out by employees of Unger Germany GmbH or their authorized specialist dealers / technicians. CAUTION Burns due to hot surfaces possible.
In order to avoid danger to the environment, an approved specialist company is to be commissioned to dispose of the filter cartridges. The local authority can provide information on this. Return the HydroPower RO for disposal to Unger Germany GmbH. www.ungerglobal.com...
Evaluation options Settings menus Quality Tools for Smart Cleaning Evaluation options Settings menus Under the menu item TOTAL VOLUME, you can see how much water has already been fed into the HydroPower RO and how much water has been produced so far. Under the menu item AVERAGES you will find the average concentration of the water at the water inlet and outlet.
Electrical equipment of machines - General requirements This is confirmed by the EC Declaration of Conformity. Unger Germany GmbH NOTE The system is only intended for professional use and operation at 230 V / 50 Hz in an industrial low-voltage network.