8.6
Conduit Risers
Conduit runs from the floor/pad to the conduit landing plate on the bottom of the I/O Bay rise 22 in. Figure
8.5 shows the open distance between the mounting pad and the UPS conduit landing plates. This rise is
the same for both the Single Cabinet and Double Cabinet versions.
*DIMENSIONS: in. (mm)
FIGURE 8.5: I/O BAY CONDUIT LANDING PLATE ELEVATION
5000 Series NEMA-3R 3-Phase UPS Installation and Operation Manual – 92975-000
* Same for 1- and 2- Bay Models
29