1
4
FIGURE 4.3: UNSHIPPING DOUBLE CABINET 5000 SERIES UPS
5000 Series NEMA-3R 3-Phase UPS Installation and Operation Manual – 92975-000
1. Remove shrink wrap.
2. Unbolt the UPS base from the
shipping pallet.
3. Use a forklift to lift the UPS off
the shipping pallet.
4. Put down the UPS and remove
the pallet.
3
5. Use a forklift to transport the UPS to it's installation
location. See Section 8.3.
9