Power Connection Cable Routing and Conduit Placement 15/25/30 kVA

The following illustrates the proper cable routing that should be followed during the power
connection process of the 15/25/30 kVA.
CONDUIT MOUNTING PANEL
Note:
1) Input and Output conductors shall be installed in separate conduits, and installed in
accordance with the latest edition of NEC and the Local Authority having jurisdiction.
2) Battery conductors shall be installed in a separate conduit and be of low resistance type.
18
TOSHIBA
INPUT CONDUIT
OUTPUT CONDUIT
BATTERY CONDUIT