4 INSTALLATION
1.
Remove the side panel.
2.
If tightened, release the stopping block (A).
3.
If a cable is connected, disconnect all wires, cut the cable tie (D), and remove the
cable.
4.
Optional: The fan with foam can at this point be removed to simplify the installation.
Note the direction of the fan (the sticker towards the inside).
5.
Strip the new wire according to specification (B).
6.
Insert the cable with about 1 cm (0.4 in.) of isolation inside the stopping block. Tighten
the stopping block by using 1.5–2 Nm (13.3–17.7 in. lb) (A).
7.
Use two cable ties to fasten the cables (D).
8.
Optional: If the fan with foam has been removed it shall now be re-installed. A symbol
on the side of the fan (G) shows the air flow direction.
9.
Install the ferrites and connect the earth wire (C). A toothed washer should be located
closest to the heat sink. Tighten the screw to a torque of 6.0 ±0.6 Nm (53.1 ±5.3 in. lb).
10. Connect all wires in accordance with illustrations for 1-phase and 3-phase. Tighten the
screw to a torque of 1.0 ±0.2 Nm (8.9 ±1.8 in. lb).
11. Ensure that the IP shield is correctly mounted on the inside of the side panel (E).
12. Reassemble the side panel (F).
13. Tighten the screws on the side panel with 3 ±0.3 Nm (26.6 ±2.7 in. lb).
3-phase
0463 416 001
- 13 -