Step 2: Connecting The Tubing And Air Supply - GE SVi 1000 Masonelian Quick Start Manual

Table of Contents

Advertisement

Step 2: Connecting the Tubing and Air Supply

To connect the air supply:
1. Install the tubing to the air supply port. Minimum tubing diameter 1⁄4" (Figure 17).
Actuator
Connection
1/4" NPT
Supply
Connection
1/4" NPT
2. Pipe the output air from the output pressure port to the actuator. Minimum tubing
diameter: 1/4".
NOTE
© 2016 General Electric Company. All rights reserved
Figure 17 Air Ports
The SVi1000 is designed to operate with clean, dry, oil-free,
instrument grade air to ANSI-ISA-57.3 1975 (R1981) or
ISA-S7.3-1975 (R1981).
.
Conduit
Connection
Masoneilan SVi1000 Positioner Quick Start Guide =| 33

Advertisement

Table of Contents
loading

Table of Contents