Integrated Magnet Assembly - GE SVi 1000 Masonelian Quick Start Manual

Table of Contents

Advertisement

12. Ensure the adjustable link turnbuckle is parallel to the valve stem. Verify that the
hole in the lever aligns with the alignment hole in the bracket when the valve is in
the closed position. Check that the bracket is mounted using the proper holes
(Figure 15).
Mounting
Holes
Align lever with
alignment hole
13. Mount the SVi1000 to the bracket and secure with four M6 socket head cap
screws.

Integrated Magnet Assembly

The IM (Integrated Magnet) assembly kit is an optional assembly intended for custom mounting
by the end user for reciprocating actuators (Figure 16). This kit allows for more leeway in instal-
lation.
NOTE
32 | =GE Oil & Gas
Figure 15 Ensure Position Linearity
Figure 16 SVi1000 Lever Installed to IM Assembly
You can use a custom bracket with the IM option. Refer to
drawing #720012413 for assistance.
A
© 2016 General Electric Company. All rights reserved
Mounting Slot
B
.

Advertisement

Table of Contents
loading

Table of Contents